Projects

Cintec - St. Mary's Wall Stabalization

Application: Rubble fill tower wall stabalization Engineer: Structures North
Project: St. Mary's - Newport Installer: Lombardi Construction Co.
Owner: Archdiocese of Providence Materials: M-10, 12, 20-1/2" Dia. SS-16-42" Long-socked w/ various exposed thread

The Problem
Loose infill stone wall - needs stabalization

Advantages

  • Internal not exposed
  • No loss of grout in cavity
  • Full contact grouting
  • Low pressure grouting and larger size drill hole sympathetic to structure substrate
Typical Repair
External strapping/banding

The Church
The Installer
The Tools
The History
The Anchor
Checking Grout
Injection Start
Injection Done